A. UNDERGOING PROJECT

Patan Hospital :
Recently we have contracted to work for Patan Hospital New Maternity Building extension project. This work is being carried first time in Nepal. The technology is very much famous in European countries.

NEC (New Embassy Compound) , New American Embassy :
We have awarded contract in June 2005 for Supply, Installation, Testing Comissioning of Entire Mechanical, HVAC, Plumbing, Firefighting, Safety Security System, Electrification and External Electrical System. The contract was awarded to work jointly with Caddell International, (USA), Enka (Turkey). The work we have awarded is very much specialized and we are committed to complete with complete satisfaction.


Physical Security Upgrades, Phora Durbar Compound for U.S Embassy
The major work associated with this project are installation of split air conditioning units and laying of under ground fuel pipeline. The project was awarded to Microtech on March 2005 and is schedule to complete on October 2006. Microtech is working as sub contractor for Desbuild Incorporated U.S.A and under supervision for Himalayan Builder and Associates.

B. MAJOR PROJECT COMPLETED

Tribhuvan International Airport Improvement Project, Package 1.1 & 1.2), Kathmandu, Nepal
This project was awarded to Microtech on May 1998 and was completed on May 2001. Microtech worked as principal subcontractor for Sambu Construction of, South Korea and the project consultants were ACRES NORR LEA Consortium (Canada) in association with BDA (P.) Ltd.

The only international standard airport in Nepal, Microtech was awarded the project in negotiated bid for Mechanical, Electrical and Plumbing works. This has been one of the major undertaken by Microtech in terms of amount involved and technical challenges. The total turnover of the project was NRs. Sixty Million Rupees and the scope of work ranges from supply and installation of all the mechanical, electrical and plumbing equipment to its installation, drawing preparation, testing and commissioning and the final handover.

Hotel Grand, Kathmandu, Nepal
Ninety-one bedroom, 4 star, hotel at Tahachal, Kathmndu and one of the tallest building in the country, was awarded to Microtech on Dec ’97 & completed on Apr '99. The scope of work involved Mechanical consultancy, design, installation and commissioning of Heating Ventilation and Air-Conditioning (HVAC) services. The total value for their work is NRs. Eight Million Five hundred thousands rupees. This was the first design / built project for HVAC system, being undertaken by Microtech with successful completion.

Atam Gyan Prachar Sangh, Kathmandu
1500 people capacity hall, at Samakusi, Kathamndu was awarded to Microtech on Aug ’98 was completed on October ’99. The scope of work involved was modification in design, installation and commissioning of HVAC and electrical services. The total value of the project is NRs. Three Million and Five Hundred Thousands Rupees. We still are actively working on this client for mechanical and electrical service.

Hotel Gangjong, Kathmandu
Sixty-five bedroom, hotel at Lazimpat was awarded to Microtech on July ’98. The scope of work involves consultancy, design, installation and commissioning of HVAC services. The project was completed on August 2000. The total value of the project is NRs. Three Million and Two Hundred Thousands Rupees and we are still attending their regular maintenance for HVAC system.



Rigpe Dorje Institute, Kathmandu
The scope of work involves consultancy, design, supply of equipments and installation of all Mechanical, Electrical and Plumbing services. Even though the project was started on February 1999, it has yet to be completed in all respect. But all the mechanical, electrical and plumbing works has been completed. This project has given us positive experience in designing of Monastery.

Hotel Shangri-La
The scope of work involves design, supply and installation of centralized HVAC system and plumbing services for the 24 new rooms in fourth floor. The plumbing service includes hydro pneumatic pump system and water treatment plant, including aeration tank works. Overall renovation of the air conditioning system and plumbing system was also awarded to microtech m & e, after the completion of fourth floor expansion project. The total value of the project was NRs. Five Million Rupees Only.

Hotel Yak & Yeti
Microtech has been involved with Hotel Yak and Yeti, one of the most reputed 5 star hotel in Kathmandu, for past 6 years. We have undertaken their turn key projects like renovation / modification of main kitchen works, electrical works for newly built parking facilities, schedule chiller maintenance and all kind of electro mechanical work. Our relationship with the client till date has been our attribute for the quality and professionalism we have shown towards our work.

Beside the hotel facilities, we have been involved with all MEP works for Modern Indian school and their housing works too. We have been working their on design built projects as well as low side installation works.

LSG Sky Chefs (Flight Catering Project)
Undertaking of M/S Soaltee Hotel Limited, the project was awarded to Microtech on December 2001 and was completed on April 2002. One of the most sophisticated and specialized kitchen, Microtech was responsible for supply and installation of HVAC equipments, namely chiller, AHU, FCU, Walk in Refrigerators, fire pump and accessories. We have successfully installed air conditioning system that have requirement for 2 zone at same time with one chiller system. The total value of the project was Nrs. Fourteen Million Rupees.

Phora Durbar Electrical Upgradation Project, Embassy of the United States of America
The scope of work involves installation of fiber glass tanks, day oil tank, fuel dispensing unit, fuel pipeline works, installation / testing and commissioning of generator set, civil works for preparation of generator works. This project was awarded to Microtech M & E on September 2001 and was completed on Feb 17, 2002. This project is done on lump sum basis with value of NRs. Five Million Six Hundred seventy thousands three hundred eighty seven rupees and five paisa only (NRs. 5,670,387.05 Only)

Public Affairs and Consular Service Relocation Project for U.S. Embassy at Hotel Yak and Yeti
Microtech has recently completed this project which involved MEP works for Consular section and Public Diplomacy Section of U.S. Embassy. This project was awarded to Microtech on October 2004 and completed on April 2005, with an total value of NRs. Twenty Million Rupees. The scope of work covered under this project was supply and installation of technologically advanced HVAC system which included Building Automation System, VAV boxes, specialized AHUs and DG set, stabilizer, UPS system, security system, data/telephone networking. All the testing and commissioning was done by Micrtoech.

Information Technology Park, Banepa
Undertaking of His Majesty’s Government of Nepal, Microtech was awarded this work as sub contractor for Chitwon COE. Microtech was involved in supply and installation of all the electrical works, that involves DG set, Transformer works, electrification, under floor data/telephone networking. The project was awarded to Microtech on July 2002 and was completed on May 2004.




Casino RAD
Built at facilities of Hotel Radisson in Kathmandu, Microtech was awarded this as a turnkey project. HVAC, plumbing and electrical system were designed and all the installation work were completed on time. This project has challenges of connection works for electrical, plumbing and chill water pipeline from the existing facilities, which we completed with out any disturbance to the ongoing facilities. The project was awarded on March 2003 and was completed on January 2004.

Casino Tara
Built at Hyatt Regency, this casino project too, was awarded to Microtech on turn key basis. All the MEP works were carried out from post construction phase to the final hand over phase. Started on April 2003 it was completed on March 2004.

B.P.Koirala Cancer Memorial Hospital, Bharatpur
Microtech worked with principal architect M/S Design Cell for design of centralized HVAC system. Being a very specialized health facilities, we were able to successfully design and strongly supervise the installation work, till it has been handed over. This was our first design project in which we were not involved as contractor.

Nepalgunj Medical College, Nepalgunj
High end hospital facilities service, Microtech was awarded this project for plumbing and sanitary works under Chitwon COE as sub contractor. All the plumbing pipelines with sanitary fixtures work were carried out by Microtech. The project was awarded on August 2000 and successfully completed on March 2002.

Extension and Reinforcement of Power Transmission system and Distribution System for Kathmandu Valley, Phase 3
With finance from Government of Japan and under direct supervision from Consortium of Kinden and Sumitama Corporation, Japan , Microtech was awarded this challenging project on August 2004. The project was completed on April 2004 where in Microtech worked as sub contractor for J.B. Construction Ltd. The major work carried our under this project were Installation, Testing & Commission of equipments at 3 substation in Kathmandu Valley. The approximated cost of the project was NRs. Five Million Rupees.

B.P.KOIRALA Institute of  Health Science ,  Ghopa Dharan
"Operation and Maintenance of Electrical works and Energy Audit works" was awarded to Microtech M & E on November 2005, for a period of one year with possibility of extension up to 3 years. The project is our new endeavor into maintenance related works for operation and maintenance of electrical system. Spread into lush 500 Acres of land in scenic Dharan (formerly known as Ghopa Camp), this project is very much challenging due to critical nature of hospital. Major scope of work under this contract consists of all kind of electrical maintenance and operation works for hospital facilities, hostel complexes and teaching districts. Though our contract is only for electrical maintenance and operation, we plan to improve the overall electrical system of the hospital with in period of one year, especially in field of fire alarm system, effective operation of powerhouses and energy audit works.

Tribhuvan International Airport Improvement Project, Package No. 6.2, Cargo Building
Working as sub contractor for M/S Hanil Koneko JV, Microtech was responsible for designing and installation of almost 1600 wet type sprinkler system. The work included sprinkler and fire hydrant pump set. The project was awarded on July 2001 and completed on August 2003.

Tribhuvan International Airport/Air Cargo Division :
Recently we have successfully completed construction of cold room at Tribhuvan International Airport. The Nepal's International Airport have such Cold Room Capacity of 18MT including Fruit, Vegetable, Meat, Poultry to be stored for export provision.

Ratobangla School:
Recently we have completed sanitary and plumbing work for Rato Bangla School at Lalitpur.
Tilganga Eye Hospital:
We have also completed fire fighting work at Tilganga Eye Hospital.
Hospital for Neurological and Allied Science
Microtech has been awarded the plumbing works for this project under M/S Chitwon COE. The project is under construction and is scheduled to complete on February 2006. Works associated with this project as plumbing pipelines and sanitary fixtures works. All the detailed design and drawing has been completed for this project.
Hospital for Neurological and Allied Science
Microtech has been awarded the plumbing works for this project under M/S Chitwon COE. The project is under construction and is scheduled to complete on February 2006. Works associated with this project as plumbing pipelines and sanitary fixtures works. All the detailed design and drawing has been completed for this project.